DESCRIPTION
APPLICATIONS
Aligner for formwork in walls.
DESCRIPTION
To be placed in the foundation before the assembly of the falsework or mold. It serves as a guide and aligner. Two nails are required for installation, which can be done manually or with a gun.
- •Parts made of 100% polypropylene or polyethylene with pigment.
- •Manufactured under plastic injection process.
- •100% waterproof and inert product, does not react with concrete and prevents cracks.
- •Optimal performance under extreme temperatures (-5 to 55c).
- •Parts manufactured according to international standards ACI 318 s-05, chapter 7. (Reinforcement Details)
UT-SERIES
To be placed in the foundation before the assembly of the falsework or mold. It serves as a guide and aligner. Two nails are required for installation, which can be done manually or with a gun.