top of page

DESCRIPTION

APPLICATIONS

 

Aligner for formwork in walls.

 

DESCRIPTION

 

To be placed in the foundation before the assembly of the falsework or mold. It serves as a guide and aligner. Two nails are required for installation, which can be done manually or with a gun.

 

  • •Parts made of 100% polypropylene or polyethylene with pigment.
  • •Manufactured under plastic injection process.
  • •100% waterproof and inert product, does not react with concrete and prevents cracks.
  • •Optimal performance under extreme temperatures (-5 to 55c).
  • •Parts manufactured according to international standards ACI 318 s-05, chapter 7. (Reinforcement Details)

UT-SERIES

  • To be placed in the foundation before the assembly of the falsework or mold. It serves as a guide and aligner. Two nails are required for installation, which can be done manually or with a gun.

bottom of page